Look beyond individual workstreams
The risks do not
stop at the plant boundary.
A sound technical concept can still face an undeliverable schedule, an unavailable connection or an unallocated contractual risk. The review must connect engineering findings with the wider investment assessment.
01Commercial & market
Are feedstock, energy supply, offtake and pricing assumptions credible—and consistent with the plant’s actual capabilities?
02Permits & environment
Do land rights, approvals, environmental obligations and safety requirements support the proposed scope and timetable?
03Execution & schedule
Are engineering maturity, procurement, long-lead items, construction access and commissioning reflected in the delivery plan?
04Operations & lifecycle
Can the asset achieve its availability and efficiency targets? Review maintenance, staffing, replacement needs and end-of-life obligations.
05Contracts & interfaces
Who owns each package boundary and performance obligation? Identify gaps between suppliers, EPC contractors and infrastructure partners.
06Financial assumptions
Do the investment model’s production, OPEX, CAPEX and ramp-up inputs match the evidence? Test downside cases with the financial advisers.
Technical and CAPEX findings should inform—and be reconciled with—specialist legal, tax, commercial, environmental and financial due diligence.